„D48 Rybí – MÚK Rychaltice“ earthworks on building objects C 270 – C 279
Project Description:
The subject of the implementation was earthworks, which consisted of excavations and backfills for the construction of 12 gabion retaining walls as part of the reconstruction of the D48 highway in the Rybí – Rychaltice section. During the implementation 85,000 m3 of soil was excavated and relocated. A total of 53,000 m3 of material was imported and deposited in the backfills, and a total of 26,500 m2 of topsoil was spread. The work was carried out over a period of two years. In the handling of the soil were used especially small machines about 5 t.