Chimney demolition H = 110m, incl. processing of project documentation for the removal of the building
Project Description:
Demolition of a reinforced concrete chimney 110 m high, including lining. Demolition was done from top to bottom using a specially modified demolition excavator placed on a special structure – a tripod suspended from a mobile crane.
The work was hampered by bad weather because it took place in the winter.