Demolition of part of the SO 101 building and the adjacent warehouse
Project Description:
Demolition of the production hall from concrete parts, prestressed ceiling trusses and cladding, including the construction of a dividing wall separating the demolished structures from the ongoing operation.
Dimensions of the demolished hall: 38 x 142 x 12.5 m, enclosed space 55,960 m3, steel structures 505.09 t.