Demolition work and earthwork in the framework of the reconstruction of the administrative building, which was put into operation in 1935 as the headquarters of the Electric Companies. It was a building with 3 under-ground floor and 7 above-ground floor, whose construction and technological systems were beyond the lifetime. A complete reconstruction of the building was necessary and it was designed with regard to heritage protection as a real cultural monument of the capital city of Prague.