Demolition of bridge structures
The subject of the realization was the complete demolition of the bridge structure – demolition work of cornices, load-bearing structures, ie. beams, transition plates, parts of supports and pillars. The total length of the bridge was 120 m, width 12.75 m and height above water about 5 m. The bridge had 4 fields and in each field 8 beams with a length of 27 m. The weight of one beam during dismantling was about 38 tons.