Demolition of bridge structures
The subject of the implementation was the complete demolition of reinforced concrete bridge structures on the D1 route: SO 13-201.1 and SO 13-203.1 and the partial demolition of reinforced concrete bridge structures SO 12-201.1, SO 12-201.2 and SO 12-202. The dimensions of the completely demolished bridges were: for SO13-201.1 – length 48 m, width 11.75 m and height 6.5 m; for SO13-203.1 – length 38 m, width 14.75 m and height 5.5 m. The generated concrete waste was transported to an intermediate landfill specified by the customer. Demolition gave 106.66 t of iron and steel (170405).