Demolition of electrostatic precipitator, Block 3, EPR1.
Project Description:
The scope of the project was the complete demolition of the technological unit of electrostatic precipitator of boiler K3, consisting of electroplates, ash hoppers, and flue gas ducts. The dimensions of the electrostatic precipitator were 23.3 x 20.3 x 30 meters; enclosed space: 10,169 cubic meters. It involved 367 tons of steel structures.