The subject of the project was demolition work on four bridge structures, which were carried out at weekend closures, always in two stages of half the bridge structures. After demolition, the demolished concrete debris was loaded and transported to an intermediate depot and processed by crushing to a 0/100 mm fraction material for further use on site.