Complete dismantling of steam boilers including electrofilter and auxiliary equipment together with chimney demolition – CEZ Skawina S.A.
Project Description:
Implementation of the construction project together with applying for a demolition permit, processing of POR, BIOZ, and demolition documentation. Preparation of the construction site, provision of adjacent installations and passages, technical review of the Technical Inspection Office (UDT) for the necessary equipment. Preparation of a landfill site for temporary storage of rubble and scrap obtained from demolitions. Extraction of steel scrap and non-ferrous metals, burning to batch sizes, transport of scrap to the place specified by the client.
Demolition and liquidation of buildings. Cleaning and reclamation of the area.