„City Park Ružinov“ – demolition of structures building D / stage A, B, C, D, E /
Project Description:
It was a demolition in five stages A to E, which included the demolition of the A-B tower, the B-C tower, the sink, two Wellness. The total amount of 10,586.70 t of debris and 1,579.20 t of soil was demolished. Total enclosed space concerned – 4,297.50 m3. Crushing of rubble – 92.088 t of recycled concrete – was carried out at the construction site.