These 2 pictures were taken at Bialsko-Biala Power Station, one of our large-scale projects. The project involved demolition of 32 underutilized buildings in total. For example: 2 chimneys with a height of 120 and 160 m, cooling tower with a height of 56 m, boiler room, engine room, and so on. The contract was executed between 2019-2021.