In October 2011, we implemented the demolition of a footbridge in power plant Prunéřov. The route footbridges led over electrified sidings EPR1 and EPR2 at a height 8.5 m.
It was the destruction of the steel tube construction footbridge including supporting steel pillars, demolition of iron-concrete footings below the surrounding terrain and the subsequent soft terrain modifications including grassing. Before the actual liquidation of the footbridge was necessary to perform a complicated and demanding relocation of fiber optic cables. We transferred to the client the contract without defects and backlogs in November this year.