2009:
| PERFORMANCE OF REPAIR FOR SPREADING KERIZOL 3 (HYGIENIC LOOP) | ARCELORMITTAL FRÝDEK-MÍSTEK, A. S. |
| EARTHMOVING WORKS FOR ORDER A-Z ISOLATION OSTRAVA-HARD LANDSCAPING OF OUTSIDE STORE | D5,AKCIOVÁ SPOLEČNOST TŘINEC |
| DEMOLITION OF GROSS CONDESATION FOR ORDER KB NR. 10 MODERNIZATION - OSTRAVA-PŘÍVOZ | HUTNÍ PROJEKT FRÝDEK-MÍSTEK A.S. |
| REPAIR OF PROPERTY AMONIA PLANT | OKD, OKK, A.S. |
| DEMOLITION – REMOVAL OF CONSTRUCTION COMPRESSOR PLANT IN AREA COKING PLANT SVOBODA, ON THE PLOT OF NR. |
OKD, OKK, A.S. |
| WORKING ON ORDER GO VP3 IN AREA ARCELORMITTAL STEEL OSTRAVA | TEPLOTECHNA OSTRAVA A.S. |
| DEMOLITION OF PROPERTY FOR ORDER „ INTEGRATED SAFETY CENTER OF MORAVIAN-SILESIAN“ | TCHAS, SPOL. S R.O. |
| DEMOLITON OF TWO PARTS OF STEEL PLANT III | TŘINECKÉ ŽELEZÁRNY, A.S. |
| FABRICATION OF FOUNDATION CONSTRUCTION AND MOUNDS IN HALL FOR MANUFACTURING OF MAMBRANE PANEL | TECHFLOOR S.R.O. |
| RECONVERSION OF ARMATURE KRNOV – DEMOLITION OF PROPERTIES | ARMATURKA KRNOV S.R.O. |
| RECONSTRUCTION OF ROOF CLADDINGS, ROOF-LIGHTS, DOWN-LEADS AND LATERAL WINDOWS AT AMFM | ARCELORMITTAL FRÝDEK-MÍSTEK, A.S. |
| REPAIR OF INTER-ROOF SPOUNTING UPON ROOF OF COOLING TABLE IN AREA TŽ A.S. | TŘINECKÉ ŽELEZÁRNY, A.S. |
| REMOVAL OF DEPOSIT CARBON IN CHAMBER NR. 6 AND NR. 8 | TŘINECKÉ ŽELEZÁRNY, A.S. |
| DEMOLITION OF REINFORCED CONCRETE CHIMNEYS NR. 1 AND NR. 2 WITH HIGH |
ELEKTRÁRNA POŁANIEC S.A: GRUPA GDF SUEZ ENERGIA POLSKA |
| DISMANTLING AND DEMOLITION OF MECHANICAL ESTABLISHMENT OF COKE BATTERY | TŘINECKÉ ŽELEZÁRNY, A.S. |
| DEMOLITION WORKS AT WATERPOWER STATION – BARRAGE SPYTIHNĚV | CESIS S.R.O. |
| REALIZATION OF FLOODPROTECTION PROVISION AT TŽ, A.S. – PROLONGATION FLOOD CONNECTOR UNDER KJT | TŘINECKÉ ŽELEZÁRNY, A.S. |
| REPAIR OF FLOOR AND WALLS OF CHAMBER NR. 6,5,4 | TŘINECKÉ ŽELEZÁRNY, A.S. |
| REPAIR OF LOCAL COMUNICATIONS | OBEC NÝDEK |
| EARTHMOVING WORKS FOR ORDER KSV – GROSS CONDENSATION | SIPOSAN, S.R.O. |
| GROSS CONDESATION ON PRODUCTION UNIT KOKSOVNA- SVOBODA IN OSTRAVĚ-PŘÍVOZE | SIPOSAN, S.R.O. |
| DEMOLITION WORKS AND MOUND INCLUDING COMPACTION AREA ON CONSTRUCTION – RIDDING HALL CHOTĚBUZ | SIPOSAN, S.R.O. |
| TECHNICAL BACKGROUND - GOLF ROPICE | D5,AKCIOVÁ SPOLEČNOST TŘINEC |
| RECONSTRUCTION OF PART OF ROOF CLADDING OF RETIRING ROOM KJT | D5,AKCIOVÁ SPOLEČNOST TŘINEC |
| RECONSTRUCTION OF HOLIDAY CENTER IN HORNÍ LOMNÁ | D5,AKCIOVÁ SPOLEČNOST TŘINEC |
| COMPLETE PERFORMANCE OF CONSTRUCTION – HT Ú - HYPERMARKET | PSG INTERNATIONAL, A.S. |
| PRODUCTION-STORE AREA OF LENA - HRAČKY S.R.O. - DOLNÍ BENEŠOV | HSF SYSTÉM A.S. |
| EARTHMOVING WORKS KERN - BALINY | HSF SYSTÉM A.S. |
| DEMOLITION WORKS OF FURNACE SIB NR.5 AT AREA OF COMPANY. HYES LEMMERS ALUKOLA, S.R.O. | TEPLOTECHNA OSTRAVA A.S. |
| CONCRETE AND BITUMEN CRUSHING – AREA MARTINOV | DOPRAVNÍ PODNIK OSTRAVA |
| ACCIDENT REMOVAL OF BELT CONVEYOR BRIDGE OF BLAST FURNACE NR. 4 | ARCELORMITTAL OSTRAVA A.S. |
| DAMAGE REMOVAL AT FLOODED AREAS | MORAVSKOSLEZSKÝ KRAJ |
| RECONSTRUCTION, MODERNIZATION, ADAPTATION PRIMARY SCHOOL ČELADNÁ – FOURTH PHASE – GYM OUTBUILDING | VCES A.S. |
| HOTEL VENDRYNĚ | VITALITY SLEZSKO, S.R.O. |
| ROUTE OPTIMALIZATION ST.BORD. SR – MOSTY U JABLUNKOVA -BYSTŘICE NAD OLŠÍ, SO 14-19-03 RAIL.ST. JABLUNKOV-NÁVSÍ, FOOTBRIDGE IN KM 289,965 | RESA-SANACE A REKONSTRUKCE, SPOL. S R.O. |
| WATER TOWER REPAIR | D, A.S. |
2008:
| FLYOVER DEMOLITION – ROAD 11/479 STREET ČESKOBRATRSKÁ - OSTRAVA | ODS - Dopravní stavby ostrava , a.s. |
| DISMANTLING THE STRUCTURE, MOUNTING TRAPEZOIDAL METAL PLATE AND VAPOUR CHECK - TAWESCO, LTD. | A.T.Y.P. group, s.r.o. |
| CONSTRUCTION PART OF THE BUILDING, INCLUDING FURNACE CONNECTIONS FOR HIGH ANNEALING | ArcelorMittal Frýdek - Místek, a.s. |
| CONSTRUCTION OF THE PLANT DONGWON MATADOR – GROUND-SHAPING, ALL ENGINEERING NETWORKS | PSG International, a.s. |
| REMOVAL OF THE RAILWAY BRIDGE AT KM 304,535 - BYSTŘICE NAD OLŠÍ | FIRESTA-Fišer, rekonstrukce, stavby a.s. |
| CONSTRUCTION OF APPLIER LINE | Beskydská stavební, a.s. |
| REMOVAL OF CONSTRUCTIONS PZ MOSNOV - BUNKER PHM | VOKD, a.s. |
| GROUND WORKS WITHIN THE CONSTRUCTION OF PLANT MATADOR DONGWON - BALINY | PSG International, a.s. |
| EXCAVATION WORKS FOR THE BUILDING OF GLOBUS (143 000 M3) | psg a.s., Ostrava |
| FILLING ROOM OF BOILER OIL USTO | D 5, akciová společnost, Třinec |
| CONSTRUCTION OF THE THERMAL REGULATION LINE | ArcelorMittal Frýdek-Místek a.s. |
| DEMOUNTING AND DEMOLITION OF THE BOILERS K2 AND K3 AND THEIR ACCESORIES | Průmyslové stavitelství Brno, a.s. |
| CUSTOM-MADE DEMOLITION WORK FOR CONTINENTAL MATADOR PÚCHOV | SESTAV s.r.o. |
| RECONSTRUCTION OF THE COMMUNICATION IN FRONT OF THE BUILDING VPBESS S.R.O. AND VP TECHNOTRON S.R.O. | ArcelorMittal Frýdek-Místek a.s. |
| CONSTRUCTION OF THE CAR PARK IN FRONT OF THE CARBONIZATION PLANT SVOBODA IN OSTRAVA – PŘÍVOZ | OKD, OKK, a.s. |
| BUILDING AND EXCAVATION WORKS ON THE PART „RELAYING OF THE GAS PIPE DN 1200-KSV“ - CARBONIZATION PLANT SVOBODA | Průmyslové montáže s.r.o. |
| DEMOLITION OF THE BUILDING IN THE POWER STATION PRUNÉŘOV 1 | ČEZ, a.s. |
| ROOF RECONSTRUCTION OF THE FACTORY BUILDING KJT - FINISHING HOUSE - II. STAGE | D 5, akciová společnost, Třinec |
| RECONSTRUCTION OF THE SKI-JUMPS K25 AND K40 IN NÝDEK | Tělovýchovná jednota -Třineckých železáren Třinec |
| CONSTRUCTION OF THE GAS FURNACE FOR HIGH-TEMPERATURE ANNEALING - CONSTRUCTIONAL PART | ArcelorMittal Frýdek-Místek a.s. |
| DEMOLITION OF THE BOILER HOUSE K5 AND THE CHIMNEY IN ZLÍN IN KŘIBY | AIP-development s.r.o. |
| DIGGING UP OF FURNACE BOTTOM OF THE BLAST FURNACE NO 2 | TEPLOTECHNA Ostrava a.s. |
| CONNECTING OF THE COMPANY MATADOR DONGWON CZ S. R. O. | ENERGETIKA TŘINEC, a.s. |
| PROCESSING OF THE MATERIAL FOR THE IRON SCRAP CAPABLE OF BEING BATCHED, INCLUDING MANIPULATION | Slévárny Třinec, a.s. |
| DEMOLITION OF THE CONCRETE AREAS IN THE AREA OF HOLCIM ROHOŽNÍK SLOVENSKO | BESTAV s.r.o. |
2007:
| DEMOLITION of REINFORCED CONCRETE CHIMNEY 100 m IN grounds of TŽ, as | D5, a. s. |
| SHOPPING CENTRE INTERSPAR OSTRAVA PORUBA | IMOS Brno, a. s. |
| >KJT ROOF REPAIR | D5, a. s. |
| ANNEALING ROOF REPAIR | D5, a. s. |
| DEMOLITION OF STRUCTURES OF THE FORMER GROUNDS OF PREFA NÝŘANY | INTERCORA, s. r. o. |
| SHOPPING CENTRE TESCO ČESKÝ TĚŠÍN | IMOS Brno, a. s. |
| COATING REPAIR OF OXYGEN CONVERTER STEEL PLANT HALL | Třinecké železárny, a. s. |
| SHOPPING CENTRE TESCO TŘINEC – DEMOLITION, GROUND PREPARATION, ROUGH LANDSCAPING | IMOS BRNO, a. s., Třinec Properte Development |
| DEMOLITION AND DISMANTLING WORKS OF REVOLVING FURNACE LINE KZ II. V HOLCIM A.S., ROHOŽNÍK | SUNEX |
| DEMOLITION 80M REINFORCED CONCRETE CHIMNEY – LOMNICE NAD POPELKOU | Technolog technický textil, a. s. |
| OC KLATOVY – DEMOLITION OF FORMER GROUNDS OF ŠKODA | INTERCORA, s. r. o. |
| DEMOLITION OF COAL TOWER (LIQUIDATION OF OLD ECOLOGICAL BURDENS) | D5, a. s. |
| SHOPPING CENTRE KRNOV | IMOS Brno, a.s. |
| LIQUIDATION OF AMCO FURNACES | Teplotechna Ostrava, a.s. |
| OC TEPLICE - DEMOLITION OF FORMER GROUNDS OF ŠKODA | Projekční společnost obchodních center, v. o. s. |
| LIQUIDATION OF GARRETT WINDING LINE – REINFORCED CONCRETE STRUCTURES DEMOLITION | D5, a. s. |
| DEMOLITION OF CEMENT FACTORY | Holcim a.s., Rohožník, Slovensko |
| WINDING-UP OF THE COUNTER-FLOW DRYERS– REFRASIL | D 5, akciová společnost, Třinec |
| DUSTING OFF OF SKIP PITS | D 5, akciová společnost, Třinec |
| COMPLETE REVITALIZATION OF THE AREA DISTURBED BY THE PKÚ S.P. MINING – EXCAVATION WORKS, COMMUNICATION | Stavby silnic a železnic, a.s. |
| ET – BOILER HOUSE E2 – CONSTRUCTIONAL PART AND CONCRETE CONSTRUCTION – BOILER HOUSE FOR A NEW BOILER NK1- DEMOLITION WORKS | D 5, akciová společnost, Třinec |
| REMOVAL OF THE BUILDING OF THE FORMER NAPHTHALENE SUBLIMATION | STAMONT - POZEMNÍ STAVITELSTVÍ s.r.o. |
| REMOVAL OF THE GRAB BRIDGE CRANE 10T | Třinecké železárny, a.s. |
| EXCAVATION AND DEMOLITION WORK IN SANATORIUM JABLUNKOV | Beskydská stavební, a. s. |
| EXCAVATION – MOTORWAY D47, CONSTRUCTION HRUŠOV – BOHUMÍN | FIRESTA-Fišer, rekonstrukce, stavby a.s. |
| EXCAVATION – THE BRIDGE OVER SUŠANKA - HAVÍŘOV | FIRESTA-Fišer, rekonstrukce, stavby a.s. |
| DEMOLITION OF THE DUKLA BUILDINGS | OKD, a.s. |
| DEMOLITION OF THE BUILDING HDV IN THE AREA OF DUKLA | VOKD, a.s. |
| NEW AFL IN THE CASTING HOUSE IN THE AREA OF TŽ | D 5, akciová společnost, Třinec |
| WORK OF THE EART MOVING MACHINE LIEBHER R 964 LITRONIC IN THE SECONDARY RAW MATERIAL PLANT | Třinecké železárny, a.s. |
| DISMANTLING AND DEMOLITION OF THE BUILDINGS IN THE UK COKE-CHEMICAL PRODUCTION IN THE TŽ, A.S. | D 5, akciová společnost, Třinec |
| REMOVAL OF PIT FURNACES | STAMONT - POZEMNÍ STAVITELSTVÍ s.r.o. |
| SUPERMARKET LIDL BOHUMÍN - DEMOLITION | Lidl Česká republika, v.o.s. |
2006:
| DEMOLITION AND ROUGH LANDSCAPING IN CONSTRUCTION OF THE ORCHARD OSTRAVA | IMOS Brno, a.s. |
| DEMOLITION OF THREE CONSTRUCTIONS OF MATERIAL LINE | TŽ, a.s. |
| DEMOLITION OF FACILITIES IN THE GROUNDS OF SOVINEC – K.Ú. KARVINÁ DOLY | VOKD, a.s. |
| INDUSTRIAL ZONE NOŠOVICE | TCHAS,a.s. |
| DEMOLITION WORK ON A BUILDING SITE – PRODUCTION OF BIOETHANOL, LEOPOLDOV (SK) | Skanska SK, a.s. |
| DEMOLITION OF PICKLING HALL, ENGINEERING NETWORK RELAYING AND CHEMICAL SEWAGE RECONSTRUCTION VPFM, A.S. | GEOtest Brno, a.s. |
| SHOPPING CENTRE KAUFLAND ČESKÝ TĚŠÍN | IMOS Brno, a.s. |
| REPAIR OF THE BLAST HEATER |
D 5, akciová společnost, Třinec |
| REPAIR OF THE BRIDGE ACROSS THE RIVER OLŠE |
ODS - Dopravní stavby Ostrava, a.s. |
2005:
| A BROUGHT OF A BRIDGE OVER A TRACK OF CD - OSTRAVA, RUDNÁ STREET | ODS - DSO, a. s. |
| DEMOLITION OF ELECTRIC STEELWORK HALL IN THE GROUNDS OF SOCHOROVA ROLLING MILL KLADNO – DŘÍŇ | TŽ, a. s. |
| DEMOLITION OF FACILITIES – JUNK, RUŽOMBEROK (SK) | Bohuslav Mrózek Sk, s. r. o. |
| HYPERMARKET TESCO KROMĚŘÍŽ (DEMOLITION WORKS + ROUGH LANDSCAPING) | IMOS Brno, a. s. – Ostrava plant |
| DEMOLITION OF THE COKE-QUENCHING STATION | Třinecké železárny, a.s. |
| DEMOLITION OF THE BUILDINGS OF THE FIRMS TON AND PIKA IN UHERSKÉ HRADIŠTĚ |
IMOS Brno, a.s., závod Ostrava |
2004:
| SHOPPING CENTRE OPAVA – DEMOLITION AND GROUND WORKS | IMOS Brno, a. s. |
| DEMOLITION OF KB NO. 10 IN COKING PLANT SVOBODA - OSTRAVA | VOKD, a. s. |
| SHOPPING CENTRE ZLÍN - ČEPKOV (DEMOLITION) | PSG, a. s. |
| FLOOD-PROTECTED DIKE – BUILDING AND DEMOLITION WORKS | Linde Technoplyn a.s. |
2003:
| DEMOLITION OF WINTER STADIUM OF JOSEF KOTAS IN OSTRAVA INCLUDING SURROUNDING BUILDINGS | VOKD, a. s. |
| DEMOLITION OF REINFORCED CONCRETE COOLING-TOWER 32 M HIGH IN THE GROUNDS OF TŽ, A.S. - DORRY | Energetika Třinec, a. s. |
| DEMOLITION AND GROUND WORKS - GO KONTIJEMNÉ TRATIV TŽ A.S. - GO MORE JTK - III. PERIOD | Pozemní stavitelství Zlín, a. s. |
| ROUGH LANDSCAPING – SHOPPING CENTRE FRÝDEK - MÍSTEK (KAUFLAND) | Skanska CZ, a. s. |
| DEMOLITION OF ŽERMANICE ROAD BRIDGE | ODS – dopravní stavby Ostrava, a. s. |
2002:
| RECONSTRUCTION OF PROTECTIVE CASE OF CHIMNEY 120 M | ŽDB Bohumín |
| DEMOLITION AND EXCAVATION WORK – DŘÍŇ KLADNO ROLLING MILL | IPS Skanska, CZ, a. s. |
| DEMOLITION OF RAILWAY BRIDGE “MOUSE HOLE TŘINEC” | Firesta, a. s. |
| DEMOLITION OF A ROAD BRIDGE - BOHUMÍN SKŘEČOŇ | ODS –dopravní stavby Ostrava,a. s. |
2001:
| ENTIRE BUILDING AND GROUND WORKS DURING CONSTRUCTION KAUFLAND OLOMOUC | IPS Skanska CZ, a. s. |
| COATING REPAIR OF BRICK CHIMNEY | Hedva, závod Jedlová |
2000:
| ROOF CLADDING EXCHANGE OF STRIPPING HALL, ABOUT 7000M2, ROOF STRUCTURE PAINTING ABOUT 5000 M2 | Steel plant, Třinecké železárny, a. s. |
| COMPLEX DISMANTLING OF TWO LAYERS OF WOODEN ROOF CLADDING INCLUDING THERMAL INSULATION, NEW ROOF CLADDING SUBSTITUTION, TRAPEZOIDAL METAL PLATE WITH VARNISHING FINISH COATING, THERMAL INSULATION + 2X WATER-PROOFING, ABOUT 900M2 | Hedva Moravská Třebová |
1999:
| DEMOLITION OF BRICK CHIMNEY VP VI, 80 M | Třinecké železárny a. s. |
| REINFORCED CONCRETE CHIMNEY REPAIR 120M HIGH | Teplárny Karviná |
1998
| DISMANTLING OF BOILER TECHNOLOGY | Zásobování teplem Vsetín |
1997:
| REMEDIATION OF CONCRETE 120M CHIMNEY CASING, ABOUT 2000M2 | ŽDB Bohumín |
| CONSTRUCTION OF STEEL HALL AND REPAIR OF TWO ROOFS, ABOUT 2500 M2 | Třinecké železárny, a. s., transport |
1996:
| DEMOLITION OF BRICK CHIMNEY OF A STEEL PLANT NO. III | Třinecké železárny, a. s. |
1995:
| DEMOLITION OF 80M HIGH BRICK CHIMNEY OF COKING PLANT | Nová Huť, Ostrava |
| DEMOLITION OF 85M HIGH BRICK CHIMNEY OF A STEEL PLANT NO. III | Třinecké železárny, a. s. |
1994:
| FLAME CUTTING OF A CASTING CRANE TO INSERTABLE SCRAP, ABOUT 220T IN 40M WITHOUT USAGE OF HEAVY CRANES, TOTAL TIME 14 DAYS INCLUDING WAGON LOADING | Třinecké železárny, a. s. |
| RECONSTRUCTION OF REINFORCED CONCRETE COOLING TOWER, 1200 M2 | Třinecké železárny, a. s. |
1993:
| MOUNTING OF ETERNIT PANELS ON THE ROOF OF COVERED COAL LANDFILL, 3500M2 | Třinecké železárny, a. s. |
1992:
| MAZUT TANKS PAINTING, 3000 M2 | Zásobování teplem Vsetín |
1991:
| PAINTING OF 120 M CHIMNEY OF ENERGETICS, ABOUT 1500 M2 | Třinecké železárny, a. s. |
1990:
| EXCHANGE OF ROLLING MILL D SKYLIGHTS, 3000 M2 | Třinecké železárny, a. s. |
1989:
| PROVIDING OPENING JOINT RINGS ON 80 M CHIMNEY | Třinecké železárny a. s. |